Environmental Title Picture Picture of Chicago Skyline
IDOT Preferred Inaugural Airport Configuration Report Printable Version

DISCLAIMER:

All sections of the IDOT Preferred Inaugural Airport Configuration report are downloadable in PDF (Portable Document Format) only. Please refer to the table below for specific file sizes and download times. Please be aware, some of the PDF files for the IDOT Preferred Inaugural Airport Configuration report are of a large file size and will take a significant amount of time to download and display.

Note: Times are approximate. Internet slowdowns may affect actual download time.

Chapter File Size Download Time (56k)
IDOT Preferred Inaugural Airport Configuration Report 3.11 MB 8 Minutes
Appendix A - Pages 1 - A23 4.47 MB 11 Minutes
Appendix A - Pages A24 - A46 6.70 MB 17 Minutes
Appendix A - Pages A47 - A48 37.1 MB 1 Hour 33 Minutes
ALP Review Checklist 189 KB 30 Seconds
Director Shea's Presentation 12.3 MB 31 Minutes
Illinois Department of Transportation Logo This page last updated 3/11/2008 10:01:02 AM
Copyright 2008 Illinois Department of Transportation
Design by TAMS, an Earth Tech company
South Suburban Airport Logo